Steel Halls, Warehouses and Industrial Buildings

Agricultural stores, workshops, factories, logistics and crane-beam production halls

Steel Halls, Warehouses and Industrial Buildings

Portal-frame steel buildings with sandwich panel cladding, 12 – 40 metre spans; 6-week installation.

Per-m² pricing

A steel hall is the most economical and fast solution for warehouses, workshops, agricultural buildings, sports halls and factories. It offers wide column-free spans, high ceilings and the possibility of future expansion. Roofs and facades can be clad with sandwich panels, trapezoidal sheet or translucent polycarbonate skylights.

Standard features

  • 12 – 40 m span, 5 – 12 m eaves height
  • Columns and crane beams for overhead cranes (5 – 20 tonnes)
  • Fire-resistant paint and galvanised fasteners
  • Optional load capacity on the roof for solar panels

Floors and additional structures

Industrial concrete floors can be made with steel fibre concrete; additions such as an office mezzanine, ramp, loading doors and fire stair are included in the project.

Installation is completed by our local crews in an average of 4 – 6 weeks for 500 m².

How to get a quote

Upload your project file (PDF or DWG) or briefly describe your need. Our engineers take off quantities and send a written, fixed-price quote within 24 hours. You can see the approximate price beforehand with our price calculator.

Scope of service

  • 12 – 40 m column-free span
  • Crane beam option
  • Sandwich panel cladding
  • 6-week installation

Steel Halls, Warehouses and Industrial Buildings — get a quote

Fill in the form and we will get back to you as soon as possible.

Frequently asked questions

How long is the delivery time?
Containers take 10 – 14 working days, tiny houses 5 – 6 weeks, 60 – 120 m² prefabricated homes 6 – 10 weeks, a steel hall (500 m²) 10 weeks and a light steel villa about 14 weeks. Times may change in busy periods; the firm schedule is written in the quote.
Do prices include installation and delivery?
List prices are factory-gate building prices. Delivery and installation are quoted separately according to location. Our price calculator shows an approximate total including installation (12%) and estimated delivery.
Is a building permit required?
A building permit is required for permanent structures tied to a foundation. A time-limited permit may be enough for temporary uses such as container site offices. We provide structural and architectural design support during the permit process.
Are the buildings earthquake resilient?
All our permanent buildings are designed by structural calculation according to TBDY 2018. Light steel systems are much lighter than reinforced concrete, which reduces seismic forces. The project is adapted to the region's seismic hazard and soil class.
What is the warranty period?
A written warranty of 2 years is given for the product (facade, joinery, plumbing, paint) and 10 years for the steel load-bearing system. Warranty conditions are on the Delivery, Installation and Warranty Terms page.